- Air Emissions Monitoring Plan (AEMP)
- Pre-test Plan for Source Testing
- DYEC Abatement Plan (June 2016)
- DYEC Abatement Plan HDR Review Memo (June 2016)
- DYEC Abatement Plan Phase One HDR Review Memo (June 2016)
- Abatement Plan Clarification (June 2016)
- AMESA Workplan Summary Report (February 3, 2021)
- AMESA Checklist
Air Emissions/AMESA
This website has been designed with accessibility in mind. We are working towards having the content meet compliance of the Web Content Accessibility Guidelines 2.0 Level AA. Documents from external organizations may not be accessible. If these documents are required in an accessible format, please call 905-404-0888.
The Air Emissions Monitoring Plan has been prepared to satisfy Condition 12 and 13 of the Environmental Assessment Notice of Approval and Condition 7(1), 7(2) and 7(3) of the Environmental Compliance Approval (ECA). Air emissions monitoring will start when the first discharges are emitted from the facility. The monitoring program includes:
- continuous emissions monitoring systems (CEMS)
- stack testing (also known as source testing)
Continuous emissions monitoring (CEM) of the following parameters will begin with the commencement of boiler operations: nitrogen oxides (NOx), sulphur dioxide (SO2), carbon monoxide (CO), hydrochloric acid (HCl), hydrogen fluoride (HF), ammonia (NH3), organic matter, oxygen (O2), opacity, moisture, and temperature. Live data from all CEMS parameters will be posted to the website and the facility display board.
In addition to continuous monitoring of the parameters noted above, air emissions from the facility will be tested twice per year by a stack test (source test) carried out by a qualified independent consultant. The following parameter categories will be tested during the stack (source) test:
- Metals
- Chlorobenzenes and Chlorophenols
- Polychlorinated Biphenyls (PCBs)
- Volatile Organic Matter (volatile organic compounds VOCs)
- Polycyclic Organic Matter (polycyclic aromatic hydrocarbons PAHs)
- Dioxins and Furans
- CEMS parameters
- Total Suspended Particulate Matter
- Total PM-10, including condensables,
- Total PM-2.5, including condensables
Schedule D in the Environmental Compliance Approval lists the full suite of parameters to be tested.
Air emissions monitoring results will be posted on the facility display board and on the website.
- MOECC Approval (April 2013)
- Letter to the MOECC: EFWAC Comments on the AEMP Revision (March 2013)
- EFWAC Comment and Response Table #2 (March 2013)
- Notification to MOECC of Additional EFWAC Comments (February 2013)
- MOECC Submission Letter (February 2013)
- Summary of Table Changes (February 2013)
- MOECC Comments (February 2013)
- EFWAC Comment and Response Table #1 (August 2011)
- AMESA Workplan Summary Report MECP Submission Letter (February 11, 2021)
2025
AMESA Quarterly Reports
Source Test Reports
2024
AMESA Quarterly Reports
Source Test Reports
2023
AMESA Quarterly Reports
Source Test Reports
2022
AMESA Quarterly Reports
Source Test Reports
2021
AMESA Quarterly Reports
Source Test Reports
2020
2019
2018
- Air Zone Review of 2018 Fall Source Test
- Air Zone Review of 2018 Spring Source Test
- Spring Source Test Report
- AirZone Review of Fall Source Test
- HDR Summary of Fall Source Test
- Fall Source Test Report
2017
- Air Zone Review of 2017 Fall Source Test
- Fall Source Test Report (October 2017)
- Air Zone Review of 2017 Spring Source Test
- Spring Source Test Report (May 2017)
2016
- Updated Abatement Diagnostic Test Report (December 2016)
- Fall Source Test Report (October 2016)
- Durham York Energy Centre Source Test Update
- Air Zone Review of Assessment Methods for DYEC Source Test May 2016 (September 2016)
- Abatement Process (June 2016)
- Spring Source Test Report (May 2016)
- DRAFT Source Test Dispersion Modelling Results (May 2016)
- DRAFT Source Test Summary Table (May 2016)
Ministry Correspondence
- MOECC Response to Phase 1 Abatement Plan (August 2016)
- MOECC Response to Final Abatement Plan (June 2016)
- DYEC Abatement Plan Phase One MOECC Submission Letter (June 2016)
- DYEC Abatement Plan MOECC Submission Letter (June 2016)
- MOECC Request for an Abatement Plan (May 2016)
2015
- Dioxin and Furan AMESA Evaluation Report (November 2015)
- CEMS Relative Accuracy Test Audit (RATA) Report (November 2015)
- Source Test Report (November 2015)
- 2015 Odour Test Report
Ministry Correspondence
- MOECC Approval of Source Test Report (December 2015)
- MOECC Evaluation of Source Test Report (December 2015)
- MOECC Acknowledgement of First Source Test Date (June 2015)